Project Features:
- On-site project management
- Labor and equipment
Overview
ELT Systems Group worked with the customer to finalize their layout based on product SKUs and flow needs. We supplied all of the material handling equipment to get the new 1,000,000 square foot warehouse up and running in four months from final design to shipping product out the door.
Project Execution
Our project managers were onsite during the project to make sure all local permits were handled, materials arrived on time, and the install was performed with little interruption to other activities going on inside of the facility.
Even with our scope of work expanding during the project, we still completed on time so the customer could meet the needs of getting their products out the door to their customers.
Type of Installation
In this installation, ELT Systems Group installed the following types of racking: Teardrop Pallet Racking, Cantilever Racking, High Bay Bin Storage, Facility Protection, Carton Flow, Pallet Flow, Picker Cages, Netting and Caging
Project Management Services
ELT Systems Group worked with this client to provide a multitude of services that assisted them in their design and choice of product.